Davis 1400 beams 1 of 1 e1785171211829 1024x1024

This project involved the placement of multiple structural beams as part of an ongoing infrastructure build. Utilizing our Liebherr LTM 1400, the team completed a series of picks, each requiring steady control and consistent communication from start to finish.

Working within a tight footprint and near active power lines that were de-energized and grounded prior to the crane getting into position, and until after the crane was moved out, the lift required a detailed plan and close coordination between the operator, rigging crew, and on-site personnel. Each beam was carefully positioned at a 105-foot radius, with attention to both placement accuracy and jobsite conditions.

With work taking place in a constrained area, the team stayed focused on execution and safety throughout the process. The result is a clean and efficient installation that reflects the kind of planning and teamwork these projects depend on.

LocationGrand Prairie
IndustryCivil Infrastructure