This project at a North Texas dam site involved the placement of structural components critical to ongoing construction. Utilizing our Liebherr LTM 1750, configured with a luffing jib and substantial counterweight, the team executed lifts requiring both reach and controlled handling.

 

The scale of the crane setup, along with supporting equipment and transport, required detailed planning before work began due to underground utilities all while remaining below the contractor required crane capacity percentage. From mobilization to final placement, coordination between crews ensured each piece was handled safely and positioned as intended.

 

Working within an active construction environment, the team maintained a steady pace while adapting to site conditions. The result is a clean execution that reflects the level of preparation and teamwork these large-scale infrastructure projects demand.

LocationNorth Texas
IndustryCivil Infrastructure