This project involved placing rooftop HVAC units on a multi-story building using our Grove 80-ton crane. With limited space around the building and an active jobsite, the lift required careful setup and coordination from the ground to the roof.

 

Working in a tight footprint, the crew managed crane positioning, rigging, and lift sequencing to keep the operation moving smoothly. Each unit was lifted and guided into place with steady communication between the operator and personnel on the roof.

 

Projects like this rely on planning and consistency, especially when working around existing structures and restricted access. The team completed the installation efficiently, reflecting the kind of coordination and attention to detail these everyday lifts require.

LocationLeander, TX
IndustryCommercial Construction